Mon, June 10     

The Erosion Project along #1 lake bank commences. One timber wall bulkhead is being installed across from the tee boxes, and another one will be going behind the green. The palm trees that are in the water will be relocated up onto the rear of the green. Running the length of the hole will be a relatively new product known as Dredge Sox. This system will be employed to hold the dredged lake bottom materials in a biodegradable “sock” to form a new lake bank. Turf will be planted on top of it, and the roots will grow down into the sox material solidifying the new bank. Irrigation heads and lines that are now out in the water will be lifted back up to their original positions. The project will be finished by the time we open back up on June 20, although we may still be working on some sodding and littoral plantings on Friday.

The maintenance staff will be aerifying the entire golf course all week, and using the terra rake on the fairways. This tool is very effective for removing thatch buildup, but may leave some marks until it grows back in, so please be aware.

Also on Monday, the concrete contractors will be replacing soft cart paths on #10 and #16. Please note that our maintenance staff will be eliminating the waste bunker on #15 during the August closure, reducing the coquina back to normal cart path size. Cue the fanfare!

Tues, June 11

Ajax Paving will begin milling Creek Branch Lane, Stonyriver Place, and SRB from Willow Creek/Sandycreek intersection to Streamside pool. This should take two days. Paving will be on Thursday and Friday, then striping immediately afterward. Also, the clubhouse parking lot will be powerwashed and restriped Friday afternoon. We will cordon off the entrance Friday so we can complete this work.  If you need to come to the club, please park on the grass past the entrance.

Finally, on Saturday, the painters will begin to repaint the Dining Room. Unfortunately, there is a longer lead time on the chandeliers and sconces, but on Wednesdays over the next month, we will be installing them as they are delivered.

That’s just some of what we have going on over the next couple weeks. Please reply with any questions, and have a wonderful summer!

Mike

One thought on “Summer Closure Projects

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s