Interior Redecoration Project

Dear Member,

We have just begun the Interior Redecoration Project, spanning the Grill Room through the Lobby and all the way out to the Office Foyer. Essentially, most everything will be redone except for the Dining Room. Just about all areas will be touched in some fashion, such as new paint in the Restrooms and new carpeting in the Offices and Pro Shop. It has been 6 years since any updating has been done from the last renovation, and 12 years for the areas that we use the most, such as the Grill Room, Club Room, and Hallways. Styles and trends have changed drastically in recent years, and we feel that this facelift will bring our clubhouse current with all the other new and recently renovated clubhouses around SWFL. It will be very exciting!

Tuesday and Wednesday, the Lakeview Room was closed and prepped for painting. All pictures and valences were removed and holes repaired, and primer was sprayed on the trim. All Lakeview Room and Greens Room chairs, and 5 bar stools have been taken away to be reupholstered already. We expect them back by the time we reopen from shutdown on Aug 23rd.painting

Here is a brief schedule for the project as we know it to be right now:

  • Currently:  Painting and re-carpeting the Lakeview Room and Club Room. Chairs being reupholstered in Lakeview and Greens. Tables being touched up. There will only be 5 barstools through this weekend.
  • Next week (during shutdown): Painting the Grill Room, Hallways, Bathrooms, Conference Room, Greens Room, and Foyer. Messy part should be finished by the time we reopen Aug 23rd.
  • After Aug 23rd: carpeting needs to be installed in the Greens Room, Hallways, Conference Room, Offices, and Pro Shop. I will notify the membership when I find out an installation date, and will make every attempt to do it on a Wednesday when we are closed
  • New Chairs and Tables in the Grill and Club Rooms will be delivered. Date TBD
  • New Lighting fixtures and Furnishings to be delivered and installed. Date TBD
  • Lobby work is being scheduled now. I will provide details as we go along

The main takeaway at the moment is that most of the work is being done swiftly and unobtrusively. That said, carpeting and chairs will take a few weeks, and I do not have dates for installation yet. Please be patient while we get this done as soon as possible, and keep an eye out for more information.

I would be remiss if I did not thank Lauren McGarvey and Jack Noller of Noller Design, House Chairman Paula Lockhart and her Committee: Fran Bussey, Patti Fitzgerald, Jessie Lovatt, Peggy Shick, Dick Pilc and the prior House Committee members Patty Kraska and Binnie Bragg.

More improvements: Paving

Asphalt repaving of Spring Run will take place over a couple years, starting with the most critical areas, which, according to our engineering study, are those where we run the greatest possibility of damage to the limerock road bed. Next Tuesday, Aug 14th, Ajax Paving will begin to mill and pave Spring Run Blvd at Sandy Creek Terrace west past Winding Stream and Maintenance, through Willow Creek. Then, down Sandy Creek to SRB again. Milling will take 2 days (Tuesday and Wednesday) and paving 2 days Thursday and Friday). There will be plenty of flaggers, signs, and cones to keep traffic moving and allow access to units. If you have any concerns, please feel free to reply back below.

Hope your summer is going well!

Mike

Advertisements

New Golf Course Superintendent

IMG_3541
Dear Spring Run Member,

Please join me in welcoming Benjamin S. Hanshew as our brand new Golf Course Superintendent. Ben was the Assistant Superintendent, and after working with him this past year, as well as observing his skill sets over the past month in the interim position, he was the obvious choice!

Ben was born in Oklahoma City, OK and grew up in Wichita, KS. He graduated from Kansas State University in 2007 with a BS in Horticulture, emphasis in Golf Course Management, and a minor in Business and a minor in Hotel and Restaurant Management.  He has been in the golf industry for about 22 years at high end country clubs as well as public courses. His internship was at Bellerive CC in St. Louis, MO which has hosted several PGA Championships, US Opens and various other PGA events in its history, and was involved in the prep work for the BMW Championship hosted there in 2008. He spent the next 6 years as an Assistant and Superintendent at clubs in MO. In 2014, he and his wife, Devin, moved to Fort Myers, where he worked at Gateway Golf and CC until coming to Spring Run in June 2017.

I am very happy that Ben has accepted this position. When you see him out on the course, make sure to stop and say hello!

Practice Green Renovation

Dear Spring Run Member,

If you were near the clubhouse Monday, you would have seen Ryan Golf begin the renovation of the practice green. If not, we have some pictures included that can give you an idea of what it looked like. It was quite surreal looking as the sod and a corresponding inch of root zone was sliced uniformly in contours around the green. Many people commented it didn’t look real and were surprised at what the slices of turf looked like when they held them up close.

The construction crew wasted no time as they used a bobcat to scoop the slabs of turf into the middle of the green, and then used a loader to carry them to a dumpster. We saved several cart loads of sod to use at the sod nursery behind #3 green, but the rest had to go.

IMG-7207IMG-7208IMG-7209IMG-7210IMG-7211IMG-7212IMG-7213

Next, the soil was extensively tilled by a tractor with rototiller mechanism, and was then shaped by a loader that adjusted the soil elevations to match the design created by course architect John Sanford. Tuesday morning, fine shaping will continue, supervised by an architect from the Sanford Design firm. Once the exacting contours and are achieved, the architect will sign off on it, and the contractor will begin to sprig the green with Tif Eagle Bermuda grass at a rate of 35 bushels per acre. The sprigs will be cut into the soil and will begin to grow in about a week. The grow-in period will last approximately 8-12 weeks before it is ok to putt on it. Throughout this period, the maintenance staff will be applying fertilizer and keeping a watchful eye while watering the turf throughout the day.
IMG_3855

The goal of the project is to remove the severe ridge along the back portion of the green, and smooth out the dip at the bottom by the drain. Ultimately, there will be two flatter surfaces, an upper and lower, which will more closely resemble the undulations of the current greens, and most importantly, the speed, so you know what to expect when you go out there to play.

IMG_3857IMG_3858

The project was paid for entirely through the reserve fund, and will not require any additional cost to the members. It should cost less than $20,000 in total to complete it.

If you have any questions, please reply back.

Thank you.

Mike

Rumors

Dear Spring Run Owner,

Despite several reports at Board Meetings and even the most recent Neighborhood Representatives Meeting this past Tuesday, the rumor of a Hurricane assessment persists. Just this morning, another concerned owner stopped by the office to confirm the charge. I informed him that there will be NO hurricane assessment to the Membership following the damage from Irma.

Spring Run’s hurricane deductible came out to $412,000. Our expenses came close but as of this time, have not exceeded it. Despite that, we did receive Insurance proceeds of $250,000, and we had reserved $50,000 for hurricane damage, leaving us with approximately $100,000 in expenses to the Club. The Board felt strongly that due to the assessments for damage in other neighborhoods, we could handle this cost and provide some relief to our owners.

Please help spread the word.

Thank you

Mike

Speed Bumps

Dear Spring Run Member,

Its another article discussing the oft-maligned speed bump, a necessity for the safety of pedestrians, cyclists, and frankly other drivers in a community without sidewalks, yet a nuisance for others who feel they are not needed. I certainly do not like to hit speedbumps on any roadway, but if you approach them gently, you’ll hardly notice.

The purpose of today’s article is to simply raise your awareness of the new configuration of the speed bumps, and to remind you NOT to try to fit your wheels between them. According to Fire Marshall Green, six years ago, the Florida Fire Prevention Code was changed, but it took several years to get it officially into the Village’s ordinances, which recognize EFR’s authority over the design of traffic calming devices. The Village met with Shayne and I to review the specs, which were designed to accommodate the double rear wheels of the Fire Trucks, which are wider than the front ones. Interestingly, it is does not accommodate Ambulances, as they are essentially a big pickup truck or van.  Those wheel bases are the same as a regular passenger vehicle, so unfortunately, they still hit bumps. But, as the Fire Marshall relayed to me, making the separation between bumps close enough to accommodate ambulances, and thus, all traffic,  defeats the purpose of having traffic calming devices.

Which brings me to my main point. Please DO NOT try to drive your car’s wheels between the openings of the bumps. They won’t both fit, even if one does. The main problem here is that in order to position your vehicle to attempt to navigate the openings, you are likely moving your car out of your lane and into oncoming vehicles. Not only will you hit the bump with at least one wheel, you may hit another car.

Remember the speed limit in the community is 19 MPH.

Thank you!

Mike

2018 Elections are right around the Corner!

Have you considered running for the Spring Run Board of Directors?

Perhaps you know someone who would be a good candidate?

Feel free to let Vince Corso, Chairman of the Nominating Committee, know your thoughts.

A notice of Elections will go out mid-January detailing the schedule, deadlines for submission, and other pertinent information.

If you have any questions, please contact Mike Zigler.

Happy New Year!

Mike 

Rakes in or Rakes out of Bunkers?

Dear Members,

Rakes in or Rakes out of Bunkers?  

The following is an excerpt from the USGA’s “Rules and Decisions”

“Question:  Should rakes be placed in or outside bunkers?

Answer:  There is not a perfect answer for the position of rakes, but on balance it is felt there is less likelihood of an advantage or disadvantage to the player if rakes are placed outside bunkers.

It may be argued that there is more likelihood of a ball being deflected into or kept out of a bunker if the rake is placed outside the bunker.  It could also be argued that if the rake is in the bunker it is most unlikely that the ball will be deflected out of the bunker.

However, in practice, players who leave rakes in bunkers frequently leave them at the side which tends to stop a ball rolling into the flat part of the bunker, resulting in a much more difficult shot than would otherwise have been the case.  This is most prevalent at a course where the bunkers are small.  When the ball comes to rest on or against a rake in the bunker and the player must proceed under Rule 24-1, it may not be possible to replace the ball on the same spot or find a spot in the bunker which is not nearer the hole.

If rakes are left in the middle of the bunker the only way to position them is to throw them into the bunker and this causes damage to the surface.  Also, if a rake is in the middle of a large bunker it is either not used or the player is obliged to rake a large area of the bunker resulting in unnecessary delay.

Therefore, after considering all these aspects, it is recommended that rakes should be left outside bunkers in areas where they are least likely to affect the movement of the ball.

Ultimately, it is a matter for the Committee to decide where it wishes rakes to be placed.”

And the Committee says “outside”!

Also, it has come to my attention that some members feel we are only going to renovate a few bunkers, or maybe just the greenside ones. The plan is that ALL bunkers will be replaced with the Bunker Solutions material. It is so cost-effective and  erosion-resistant, it wouldn’t make sense to leave any undone, given that the crew needs to fix them all after a downpour.

Feel free to reply with any questions.

Mike